ELECTRIC
PROJECTS
The experience in the Electric Projects field of MOTLIMA Consultores S.A has been developed in the areas of power transmission, transformation and distribution system. Planning, design and layout of the transmission and distribution lines of any capacity and voltage. Special problems related to the centralized controls and electrical interconnections. Planning and design of the urban distribution networks, design of rural electrification.
Studies
• Ministry of Energy and Mines
La Libertad, Cajamarca and Lambayeque
Pre-feasibility study: Power supply to the
Michiquillay Mining Complex.
Study of the power supply demand and offer.
1971 – 1972
• Corman – Electroperu S.A.
Lima.
Final Study: Input Interconnection of the
Corman and Marcona Mining Co.L.T. Systems
at 60 Kv over 15 Km, and Power
Delivery Substation
1974
• Electroperu S.A.
Cusco.
Final Study: Extension and Improvement of the
Primary Distribution Network to 11 Kv, of
the city of Cusco and surrounding Districts.
January 1980 – February 1981.
• National Electrical Services -
Electroperu S.A.
Loreto – Iquitos.
Final Study: Electric Distribution Network
of the city of Iquitos. LST in 30 kv.
March 1973- May 1974
• Agriculture Ministry
Tacna, La Yarada.
Final Study: Rural Electrification of Settlements
5 and 6 of Pampas de la Yarada.
Electrification of 1263 Hectares.
January – June 1975
• Empresa Minera del Hierro del Perú
San Juan de Marcona.
Final Study: Reconditioning of the Electrical
Networks of San Juan de Marcona.
July 1979 – November 1979
• Ministry of Industry, Trade, Tourism and Integration
COPESCO Plan
Cusco.
Final Study: Electrification and lighting on
four tourist circuits of the monumental area
of the city of Cusco.
1981
• Electroperu S.A.
Chiclayo.
Final Study: Improvement, Renovation and
Extension of the Electrical Networks of the
city of Chiclayo.
April 1984 – March 1985
• Electroperu S.A.
Lima – District of Churin
Final Project: Santo Domingo de Nava
SmallElectrical System.
Electrification in MT and BT of Nava and Mallay.
August 1985 – February 1986
• Electroperu S.A. – COMMSA
Puno – Azangaro.
Final Project: Azángaro Small Electrical System.
Electrification in MT and LT of 7 communities.
January 1987 – April 1988
• Cementos Yura S.A.
Arequipa.
Feasibility Study and Final Project.
Transmission Line in 138 kV from the
Charcani V Hydroelectric Power Plant to
the Lima cement factory.
October 1989 – February 1991
• Empresa de Transmisión Eléctrica
Centro Norte S.A.
Lima. District of San Juan de Miraflores
Final Study and Technical Dossier of the
Reactive Compensation of the Central
North Interconnected System made up
of 3 capacitor banks, of 30 MVAR each,
in bars of 60 V.
September 1998 – October 1999
• Luz del Sur S.A.
Lima.
Final Project and Technical Dossier: underground connection 60 kv between
the Santa Rosa and Galvez Stations with XLPE-500 mm2 wires, and 4200 m
of three-phase circuit length.
November 1999 – February 2000
• Luz del Sur S.A.
Lima.
Final Project and Technical Dossier: underground
connection 60 kv between the Santa Rosa and
Galvez Stations with XLPE-500 mm2 wires,
and 4200 m of three-phase circuit length.
November 1999 – February 2000
• Luz del Sur S.A.
Lima.
Final Project and Technical Dossier:
underground-overhead connection 60 kv
between the Neyra, Surquillo and San Isidro
Stations with reticulated polyethylene wires
of 500 mm2 and 4,000 m of three-phase
circuit length.