HYDRAULIC PROJECTS

In the field of hydraulics, the services of Motlima Consultores S.A. they have been developed within the areas of multiple purpose projects, conception, evaluation of hydraulic potentials and general planning of projects for the integral use of hydraulic resources.

Studies

Electrolima S.A.

  Lima and Junín, Provinces of Huarochiri and Yauli

   Final Study: Extension of Marcapomacocha –

   Milloc Trans-Andean Aqueduct.

   Increase of the system’s capacity from

   13 m3/sec. to 21 m3/sec

   January 1982 – March 1983

 

Invermet

   Lima.

   Final Project at the execution level of the

   Treatment Project for the Rimac River,

   in the stretch from Puente Piedra to the

   Dueñas Bridge, gravity dams made of

   concrete, 7 m and 13.5 m tall.

   December 1983 – April 1984

 

INADE – Comisión mixta

   Ecuatoriana – Peruana

  Perú – Ecuador.

   Feasibility study and final design of the

   Exploitation of the Puyango Tumbes

   and Catamayo – Chira Binational River

   Basins. Maximum exploitation through

   Marcabeli and Cazaderos Reservoirs.

   May 1976 – April 1979

 

Electroperu S.A.

  Junín.

   Final design of the Apata Tranca project;

   Regulation of 5 lakes: Lakes: Tranca Grande,

   Tipicocha, Luquina, Habascocha and

   Huacracocha a 6.5 km-long tunnel,

   and it includes 4 dams.

   October 1998 – February 2000

 

 Supervisions

Electrolima S.A.

   Lima - Junin, Provinces of Huarochiri and Yauli

   Work Supervision: Marcapomacocha - Milloc

   Trans-Andean Aqueduct 1st Stage – 2nd Stage,

   over 10 km. Extension of the  27 conduction

   works from 14 m3/sec. to 21 m/sec 1st

   Stage: January – June 1974

    2nd Stage: February – June 1976

 

INADE. Chinecas Special Project

    Ancash.

   Work Supervision: Diversion

   Canal: Sand Trap, la Huaca Stream,

   Connecting Canal, La Huaca Stream –

   Irchim over 6 km.

   December 1987 – December 1989

 

INADE. Chavimochic Special Project

   La Libertad, Province of Trujillo

    Work Supervision: 1o Stage, Package A,

   it includes 7.7 km. of open canal and a capacity

   of 80 m3/sec., 2.7 km. of open conduct and

   18 km of tunnels -

    August 1988 – September 1990

 

INADE. Jequetepeque - Zaña Special

  Project

   Lambayeque.

   Work Supervision: Talambo - Zaña Canal and

   Infrastructure of Diversion and Connection with

   the existing Irrigation System of 25.2 km of main

   canal and 14.5 km of secondary canals.

    August 1994 – September 1995

 

INADE. Pasto Grande Special Project

   Moquegua.

   Work Supervision: Pasto Grande Canal

   and Works of Art of 38.7 km.

   October 1994 - May 1995

 

INADE . Pasto Grande Special Project

   Moquegua.

   Work Supervision: Extension and Improvement

   of the Humalso canal over 20.8 km.

   October 1994 – July 1995

 

INADE . Chira- Piura Special Project

   Piura.

   Work Supervision: Remodeling and Extension

   of the Miguel Checa Canal, Package B.

   A 47 km-long Earth canal of trapezoidal and

   telescopic section for capacity of 1.3 m/sec.

   Progressive decrease down to 1.00 m3/sec.

   September 1988 – September 1993.

 

INADE . Chira- Piura Special Project

   Piura.

   Work Supervision: Construction of Stage

   III of the Special Project.

   August 1997 – November 2006

 

INADE .Proyecto Especial Río Cachi

   Ayacucho.

   Work Supervision: Apacheta –

   Choccoro Diversion Canal, 35 km long.

   January 1998 – June 1999

 

Electroperu S.A.

   Junín.

   Work Supervision: Group I: Regulations of

   Moya River High Sub-Basin

   July 1998 – February 2000

 

District Municipality of ITE

   Department of Tacna, Province of Jorge Basadre

   Work Supervision: Improvement of Irrigation

   System of ITE 2010 - 2011