HYDROELECTRIC HARNESSING
The experience of Motlima Consultores S.A. in the area of hydroelectric exploitation includes the studies and complete projects for the generation of electric power of any type of magnitude; power plants of high and low fall. Design and supervision of reservoirs, intakes and desarenadores, galleries and channels of conduction with free or pressure runoff, underground reservoirs, loading chambers, equilibrium chimneys, pressure pipes and forced ducts, sloping galleries, machine house in cavern or outside , courtyards of keys, etc.
Studies
• Compañía de Minas San Ignacio
de Morococha.
Junín.
Final Study: 6.3 MW Monobamba Hydroelectric
Power Plant
November 1978 – December 1980
• Compañía de Minas Arcata
Arequipa.
Final Study: 3.864 MW Misapuquio
Hydroelectric Power Plant
October 1978 – January 1980
• Compañía de Minas Raura
Lima.
Final Study: 6.00 MW. Ranura
Hydroelectric Power Plant.
July 1980 – December 1980
• Electrolima S.A.
Lima, Salto Bajo.
Pre-feasibility and feasibility study: Best use
of the hydroelectric resources downstream
of the Huinco Hydroelectric Power Plant
(Extension 224 MW).
November 1982 – April 1984.
• Electroperu S.A.
Lima.
Feasibility Study: 140 MW. El Platanal
Hydroelectric Power Plant
January 1985 – December 1986
Supervisions
• Energía Hidroeléctrica Andina
(Hidrandina)
Lima, Río Pativilca.
Work Supervision: 55 MW Cahua Hydroelectric
Power Plant (Pativilca)
January 1967 – July 1968
• Electrolima S.A.
Lima, Río Rimac.
Work Supervision: 120 MW Pablo Boner
Matucana Hydroelectric Power Plant,
flow of 12 m3/sec, net drop of 980m,
4 Pelton turbine units.
January 1967- November 1971
• Electroperu S.A.
Huancavelica.
Work Supervision: 217 MW. Restitución
Hydroelectric Power Plant.
3rd Stage of the Mantaro Project, expansion
reservoir of 25, 000 m3, net drop of 24m
and 3 PELTON turbines of 72.2 MW.
June 1980 – October 1985
• Compañía de Minas San Ignacio
de Morococha.
Junín.
Estudio definitivo: Central Hidroeléctrica
Monobamba 6.3 MW.
• Compañía de Minas Arcata
Arequipa.
Estudio definitivo: Central Hidroeléctrica
Misapuquio 3.864 MW.
• Compañía de Minas Raura
Lima.
Estudio definitivo: Central hidroeléctrica
Raura II 6.00 MW.
• Electrolima S.A.
Lima, Salto Bajo.
Estudio de pre factibilidad: Aprovechamiento
de los recursos hidroeléctricos, aguas abajo,
de la Central Hidroeléctrica Huinco
(ampliación 224 MW).
• Electroperu S.A.
Lima.
Estudio de factibilidad: Central Hidroeléctrica
El Platanal 140 MW.