HYDROELECTRIC HARNESSING

The experience of Motlima Consultores S.A. in the area of ​​hydroelectric exploitation includes the studies and complete projects for the generation of electric power of any type of magnitude; power plants of high and low fall. Design and supervision of reservoirs, intakes and desarenadores, galleries and channels of conduction with free or pressure runoff, underground reservoirs, loading chambers, equilibrium chimneys, pressure pipes and forced ducts, sloping galleries, machine house in cavern or outside , courtyards of keys, etc.

Studies

Compañía de Minas San Ignacio

  de Morococha.

  Junín.

   Final Study: 6.3 MW Monobamba Hydroelectric

   Power Plant

   November 1978 – December 1980

 

Compañía de Minas Arcata

   Arequipa.

   Final Study: 3.864 MW Misapuquio

   Hydroelectric Power Plant

   October 1978 – January 1980

 

Compañía de Minas Raura

  Lima.

   Final Study: 6.00 MW. Ranura

   Hydroelectric Power Plant.

   July 1980 – December 1980

 

Electrolima S.A.

  Lima, Salto Bajo.

   Pre-feasibility and feasibility study: Best use

   of the hydroelectric resources downstream

   of the Huinco Hydroelectric Power Plant

   (Extension 224 MW).

   November 1982 – April 1984.

 

Electroperu S.A.

  Lima.

   Feasibility Study: 140 MW. El Platanal

   Hydroelectric Power Plant

   January 1985 – December 1986

 Supervisions

Energía Hidroeléctrica Andina

  (Hidrandina)

   Lima, Río Pativilca.

   Work Supervision: 55 MW Cahua Hydroelectric

   Power Plant (Pativilca)

   January 1967 – July 1968

 

Electrolima S.A.

    Lima, Río Rimac.

   Work Supervision: 120 MW Pablo Boner

   Matucana Hydroelectric Power Plant,

   flow of 12 m3/sec, net drop of 980m,

   4 Pelton turbine units.

   January 1967- November 1971

 

Electroperu S.A.

   Huancavelica.

   Work Supervision: 217 MW. Restitución

   Hydroelectric Power Plant.

   3rd Stage of the Mantaro Project, expansion

   reservoir of 25, 000 m3, net drop of 24m

   and 3 PELTON turbines of 72.2 MW.

   June 1980 – October 1985

Compañía de Minas San Ignacio

   de Morococha.

  Junín.

   Estudio definitivo: Central Hidroeléctrica

   Monobamba 6.3 MW.

 

Compañía de Minas Arcata

   Arequipa.

   Estudio definitivo: Central Hidroeléctrica

    Misapuquio 3.864 MW.

 

Compañía de Minas Raura

  Lima.

   Estudio definitivo: Central hidroeléctrica

    Raura II 6.00 MW.

 

Electrolima S.A.

  Lima, Salto Bajo.

   Estudio de pre factibilidad: Aprovechamiento

   de los recursos hidroeléctricos, aguas abajo,

   de la Central Hidroeléctrica Huinco

   (ampliación 224 MW).

 

Electroperu S.A.

  Lima.

   Estudio de factibilidad: Central Hidroeléctrica

   El Platanal 140 MW.