ROAD WORKS

Motlima Consultores S.A. He has vast experience in the field of roads and transportation, which includes; the design and supervision of highways, fast transit

roads, bridges, concrete viaducts, metal

 tunnels and road tunnels.

He has supervised road works in the three regions

of Peru, which has posed a challenge both to

Motlima and its professionals who have achieved beneficial results for the country.

Studies

Ministry of Transport and

  Communications

  Lambayeque, Piura and Cajamarca

   Final Study: Mesones Muro Road,

   Olmos – Corral Quemado Section.

   Road of second order, 196 km-long;

   it includes 15 bridges.

   July 1977 – March 1979

 

Ministry of Transport and

  Communications

   Junin, Pasco and Huanuco

   Updating and complementation of the

   Study: Lima-Pucallpa Road,

   Carhuamayo – Huanuco Sector.

   A 163.7 km-long road of second order;

   it includes Ambo Bridge and 10 tunnels.

   May 1979 – May 1980

 

Ministry of Transport and

  Communications

   Amazonas and Loreto

   Final Study: Corral Quemado – Ayar

   Manco Road, Oracusa - Abra

   Campanquiz   Section. A 50 km-long,

   6 m-wide road of third order.

   October 1973 – September 1974

 

Ministry of Transport and

  Communications

   Amazonas and Loreto

   Final Study: Tarapoto Yurimaguas,132 km

   long, 6m-wide, road of second order.

   January 1974 – December 1974

 

Ministry of Transport and

  Communications

   Amazonas y San Martín

   Final Study: Improvement of the marginal

   road of the Corral Quemado – Rioja Jungle,

   276.8 km-long.

   January 1982 – August 1982

 

Ministry of Transport and

  Communications

    La Libertad and Cajamarca

    Final Study: Rehabilitation and Improvement

   of the Pacasmayo Cajamarca road, on the hot

   asphalt pavement, over 173 km.

   October 1999 – March 2000

 

Ministry of Transport and

  Communications

    Huanuco and Ucayali

   Updating and Complementation Study of

   the final Engineering and Improvement

   Studies of the Huanuco – Tingo María

   Pucallpa Road, Tingo María - Aguaytía

   Section, Stretches: Tingo Maria – Chino

   Bridge and Chino Aguaytia Bridge,

   on the hot asphalt pavement.

   September 1999 – September 2002

 

INVERMET

   Lima.

   Urban traffic study and final study: Road

   connection of Av. Del Aire,

   Av. Circunvalación and Av. San Luis.

   December 1994 – September 1995

 

Ministry of Transport and

  Communications

   Ancash

   Pre-feasibility Study for road Rehabilitation

   and Improvement in the mountains:

   Huarmey – Aija – Recuay Road, 190 km long.

   July 2003 – July 2005

 

Ministry of Transport and

  Communications

   Ancash

   Final Studies: Rehabilitation and

   Improvement of the Casma – Yautan – Huaraz

   Road, Stretch: Pariacoto – Yupash,

   on the twin-layer surface treatment.

   February 2005 – April 2007

 

Ministry of Transport and

  Communications

   Ancash

   Final Studies: Rehabilitation and

   Improvement of the Casma – Yautan – Huaraz

   Road, Stretch: Yupash – Huaraz, on the

   twin-layer surface treatment.

   January 2005 – February 2006