DAMS
The experience of Motlima Consultores S.A. in the dam area includes the complete studies and projects to make arch dams, gravity dams, buttress dams, earth dams, rock fill dam, dikes and landfills, as well as the management and execution of Works.
STUDIES
• Energía Hidroeléctrica Andina (Hidrandina)
Ancash, Pishcapaccha Valley.
Feasibility study and project at the work execution level, of Pishcapaccha
Earth Dam, 43 m-tall, with a capacity of 40 million m3 of water.
June 1981 – April 1983
• Electrolima S.A.
Lima, Huarochiri Province
Study of Feasibility and design at the construction level of Yuracmayo
earth reservoir, 53 m-tall, with a capacity of 50 million m3 of water.
September 1981 – November 1984
SUPERVISIONS
• Electrolima
Lima, Santa Eulalia, Huarochiri Province.
Supervision and management of the construction works and design of
facilities and complementary works during the constructi on stage of the
Huinco dam and regulating reservoir. Dam of 215,000 m3 of reservoir,
25.5 m-tall and with an elevation of 80 m.
1967 - 1970
• Electrolima S.A.
Lima, Santa Eulalia, Huarochiri Province
Supervision, management and start-up of the construction of Sheque
Reservoir. Earth Dam of 430,000 m3 of reservoir volume, 38.6 m-tall,
and with an elevation of 125 m.
1972 – 1975
• Moquegua Regional Government
Moquegua Region, General Sanchez Cerro Province
Supervision of the construction of the irrigation infrastructure,
Chirimayuni Dam. Capacity: 4.6 million m3 of water
2011