ROAD WORKS
Motlima Consultores S.A. He has vast experience in the field of roads and transportation, which includes; the design and supervision of highways, fast transit roads, bridges, concrete viaducts, metal tunnels and road tunnels.
He has supervised road works in the three regions of Peru, which has posed a challenge both to
Motlima and its professionals who have achieved beneficial results for the country.
STUDIES
• Ministry of Transport and Communications
Lambayeque, Piura and Cajamarca
Final Study: Mesones Muro Road, Olmos – Corral Quemado Section.
Road of second order, 196 km-long; it includes 15 bridges.
July 1977 – March 1979
• Ministry of Transport and Communications
Junin, Pasco and Huanuco
Updating and complementation of the Study: Lima-Pucallpa Road,
Carhuamayo – Huanuco Sector. A 163.7 km-long road of second order;
it includes Ambo Bridge and 10 tunnels.
May 1979 – May 1980
• Ministry of Transport and Communications
Amazonas and Loreto
Final Study: Corral Quemado – Ayar Manco Road, Oracusa - Abra
Campanquiz Section. A 50 km-long, 6 m-wide road of third order.
October 1973 – September 1974
• Ministry of Transport and Communications
Amazonas and Loreto
Final Study: Tarapoto Yurimaguas, 132 km long, 6m-wide,
road of second order.
January 1974 – December 1974
• Ministry of Transport and Communications
Amazonas y San Martín
Final Study: Improvement of the marginal road of the Corral
Quemado – Rioja Jungle, 276.8 km-long.
January 1982 – August 1982
• Ministry of Transport and Communications
La Libertad and Cajamarca
Final Study: Rehabilitation and Improvement of the Pacasmayo
Cajamarca road, on the hot asphalt pavement, over 173 km.
October 1999 – March 2000
• Ministry of Transport and Communications
Huanuco and Ucayali
Updating and Complementation Study of the final Engineering and
Improvement Studies of the Huanuco – Tingo María Pucallpa Road,
Tingo María - Aguaytía Section, Stretches: Tingo Maria – Chino Bridge and
Chino Aguaytia Bridge, on the hot asphalt pavement.
September 1999 – September 2002
• INVERMET
Lima.
Urban traffic study and final study: Road connection of Av. Del Aire,
Av. Circunvalación and Av. San Luis.
December 1994 – September 1995
• Ministry of Transport and Communications
Ancash
Pre-feasibility Study for road Rehabilitation and Improvement in the
mountains: Huarmey – Aija – Recuay Road, 190 km long.
July 2003 – July 2005
• Ministry of Transport and Communications
Ancash
Final Studies: Rehabilitation and Improvement of the
Casma – Yautan – Huaraz Road, Stretch: Pariacoto – Yupash,
on the twin-layer surface treatment.
February 2005 – April 2007
• Ministry of Transport and Communications
Ancash
Final Studies: Rehabilitation and Improvement of the
Casma – Yautan – Huaraz Road, Stretch: Yupash – Huaraz, on
the twin-layer surface treatment.
January 2005 – February 2006