STUDIES
• Ministry of Energy and Mines
La Libertad, Cajamarca and Lambayeque
Pre-feasibility study: Power supply to the Michiquillay Mining Complex.
Study of the power supply demand and offer.
1971 – 1972
• Corman – Electroperu S.A.
Lima.
Final Study: Input Interconnection of the Corman and Marcona Mining
Co.L.T. Systems at 60 Kv over 15 Km, and Power Delivery Substation
1974
• Electroperu S.A.
Cusco.
Final Study: Extension and Improvement of the Primary Distribution Network
to 11 Kv, of the city of Cusco and surrounding Districts.
January 1980 – February 1981.
• National Electrical Services -Electroperu S.A.
Loreto – Iquitos.
Final Study: Electric Distribution Network of the city of Iquitos. LST in 30 kv.
March 1973- May 1974
• Agriculture Ministry
Tacna, La Yarada.
Final Study: Rural Electrification of Settlements 5 and 6 of Pampas de la
Yarada. Electrification of 1263 Hectares.
January – June 1975
• Empresa Minera del Hierro del Perú
San Juan de Marcona.
Final Study: Reconditioning of the Electrical Networks of
San Juan de Marcona.
July 1979 – November 1979
• Ministry of Industry, Trade, Tourism and Integration
COPESCO Plan
Cusco.
Final Study: Electrification and lighting on four tourist circuits of
the monumental area of the city of Cusco.
1981
• Electroperu S.A.
Chiclayo.
Final Study: Improvement, Renovation and Extension of the
Electrical Networks of the city of Chiclayo.
April 1984 – March 1985
• Electroperu S.A.
Lima – District of Churin
Final Project: Santo Domingo de Nava Small Electrical System.
Electrification in MT and BT of Nava and Mallay.
August 1985 – February 1986
• Electroperu S.A. – COMMSA
Puno – Azangaro.
Final Project: Azángaro Small Electrical System.
Electrification in MT and LT of 7 communities.
January 1987 – April 1988
• Cementos Yura S.A.
Arequipa.
Feasibility Study and Final Project. Transmission Line in 138 kV from
the Charcani V Hydroelectric Power Plant to the Lima cement factory.
October 1989 – February 1991
• Empresa de Transmisión Eléctrica Centro Norte S.A.
Lima. District of San Juan de Miraflores
Final Study and Technical Dossier of the Reactive Compensation of
the Central North Interconnected System made up of 3 capacitor
banks, of 30 MVAR each, in bars of 60 V.
September 1998 – October 1999
• Luz del Sur S.A.
Lima.
Final Project and Technical Dossier: underground connection 60 kv between
the Santa Rosa and Galvez Stations with XLPE-500 mm2 wires, and 4200 m
of three-phase circuit length.
November 1999 – February 2000
• Luz del Sur S.A.
Lima.
Final Project and Technical Dossier: underground connection 60 kv between
the Santa Rosa and Galvez Stations with XLPE-500 mm2 wires, and 4200 m
of three-phase circuit length.
November 1999 – February 2000
• Luz del Sur S.A.
Lima.
Final Project and Technical Dossier: underground-overhead connection 60 kv
between the Neyra, Surquillo and San Isidro Stations with reticulated
polyethylene wires of 500 mm2 and 4,000 m of three-phase circuit length.
ELECTRIC PROJECTS
The experience in the Electric Projects field of MOTLIMA Consultores S.A has been developed in the areas of power transmission, transformation and distribution system. Planning, design and layout of the transmission and distribution lines of any capacity and voltage. Special problems related to the centralized controls and electrical interconnections. Planning and design of the urban distribution networks, design of rural electrification.