Ministry of Energy and Mines

  La Libertad, Cajamarca and Lambayeque

   Pre-feasibility study: Power supply to the Michiquillay Mining Complex.

   Study of the power supply demand and offer.

   1971 – 1972

 

Corman – Electroperu S.A.

   Lima.

   Final Study: Input Interconnection of the Corman and Marcona Mining

   Co.L.T. Systems at 60 Kv over 15 Km, and Power Delivery Substation

   1974

 

Electroperu S.A.

   Cusco.

   Final Study: Extension and Improvement of the Primary Distribution Network

   to 11 Kv, of the city of Cusco and surrounding Districts.

   January 1980 – February 1981.

 

National Electrical Services -Electroperu S.A.

   Loreto – Iquitos.

   Final Study: Electric Distribution Network of the city of Iquitos. LST in 30 kv.

   March 1973- May 1974

 

Agriculture Ministry

   Tacna, La Yarada.

   Final Study: Rural Electrification of Settlements 5 and 6 of Pampas de la

   Yarada. Electrification of 1263 Hectares.

   January – June 1975

 

Empresa Minera del Hierro del Perú

   San Juan de Marcona.

   Final Study: Reconditioning of the Electrical Networks of

   San Juan de Marcona.

   July 1979 – November 1979

 

Ministry of Industry, Trade, Tourism and Integration

   COPESCO Plan

    Cusco.

   Final Study: Electrification and lighting on four tourist circuits of

   the monumental area of the city of Cusco.

   1981

 

Electroperu S.A.

   Chiclayo.

   Final Study: Improvement, Renovation and Extension of the

   Electrical Networks of the city of Chiclayo.

   April 1984 – March 1985

Electroperu S.A.

   Lima – District of Churin

   Final Project: Santo Domingo de Nava Small Electrical System.

   Electrification in MT and BT of Nava and Mallay.

   August 1985 – February 1986

 

Electroperu S.A. – COMMSA

   Puno – Azangaro.

   Final Project: Azángaro Small Electrical System.

   Electrification in MT and LT of 7 communities.

   January 1987 – April 1988

 

Cementos Yura S.A.

    Arequipa.

   Feasibility Study and Final Project. Transmission Line in 138 kV from

   the Charcani V Hydroelectric Power Plant to the Lima cement factory.

   October 1989 – February 1991

 

Empresa de Transmisión Eléctrica Centro Norte S.A.

  Lima. District of San Juan de Miraflores

   Final Study and Technical Dossier of the Reactive Compensation of

   the Central North Interconnected System made up of 3 capacitor

   banks, of 30 MVAR each, in bars of 60 V.

   September 1998 – October 1999

 

Luz del Sur S.A.

    Lima.

   Final Project and Technical Dossier: underground connection 60 kv between

   the Santa Rosa and Galvez Stations with XLPE-500 mm2 wires, and 4200 m

   of three-phase circuit length.

   November 1999 – February 2000

 

Luz del Sur S.A.

    Lima.

   Final Project and Technical Dossier: underground connection 60 kv between

   the Santa Rosa and Galvez Stations with XLPE-500 mm2 wires, and 4200 m

    of three-phase circuit length.

   November 1999 – February 2000

 

Luz del Sur S.A.

    Lima.

   Final Project and Technical Dossier: underground-overhead connection 60 kv

   between the Neyra, Surquillo and San Isidro Stations with reticulated

   polyethylene wires of 500 mm2 and 4,000 m of three-phase circuit length.

ELECTRIC PROJECTS

  The experience in the Electric Projects field of MOTLIMA Consultores S.A has been developed in the areas of power transmission, transformation and distribution system. Planning, design and layout of the transmission and distribution lines of any capacity and voltage. Special problems related to the centralized controls and electrical interconnections. Planning and design of the urban distribution networks, design of rural electrification.